
CNC Brass Pipe Copper Connector
Guangzhou Shuangfeng Heating and Cooling Equipment Co., Ltd.- Standard:DIN, GB
- Material:Brass
- Connection:Female
- Surface Treatment:Chrome
- Head Type:Round
- Customization:Available
Base Info
- Model NO.:Customized
- File Receiving:Drawing or Sample
- Delivery Time:10-30 Days
- Transport Package:Customized
- Specification:customized
- Trademark:OEM
- Origin:China
- HS Code:8431499900
- Production Capacity:30000
Description


Material | Brass,Copper,Stainless steel |
Package Way | accroding to customer's requirement |
Delivery Time | 30 days as usual, it will base on the order QTY and delivery due to customer's plan |
MOQ: | 1000PCS |
Transportation | shipping or airlift |
Equipment | CNC machine |
Customized | available |
QC Inspection | 100% inspection before package and delivery |
Sample | Samples and Dimensions report will offer to customer for confirmation |

Q1:How can I get quotation from your company?
A:In order to quote you as soon as possible, please provide us the following information .
1). Detailed drawings (CAD/PDF/DWG/IGS/STEP/JPG)
2). Materials required
3). Surface treatment
4). Quantity (per order/per month/annual)
5). Any special demands or requirements, such as packing, labels,delivery,etc.
Q2:How long is the leading time from development to mass-production?
A:Normally the 1st article can be provided after confirm the design and cost. 30-60 days for first mass-production.
Q3:Can I get samples for testing?
A:We can offer free samples for small parts, but for big and high-value products, samples will be charged.
Q4: Can you provide after-sales services?
A:Of course we can Generally it is 7-15 days after you receive the goods.
Q5: How long is the leading time from development to mass-production?
A: Normally the 1st article can be provided after confirm the design and cost. 30-60 days for first mass-production.