Fastener & Fitting

Copper Tube Connector CNC Turning Parts Brass Lug Joint

Guangzhou Shuangfeng Heating and Cooling Equipment Co., Ltd.
  • Standard:DIN, GB
  • Material:Brass
  • Connection:Male
  • Surface Treatment:Without Treatment
  • Head Type:Round
  • Customization:Available

Base Info

  • Model NO.:customized
  • Delivery Time:10-30 Days
  • File Receiving:Drawing or Sample
  • Transport Package:Customized
  • Specification:customized
  • Trademark:OEM
  • Origin:China
  • HS Code:8431499900
  • Production Capacity:30000

Description

Copper Tube Connector CNC Turning Parts Brass Lug JointCopper Tube Connector CNC Turning Parts Brass Lug JointCopper Tube Connector CNC Turning Parts Brass Lug Joint 
MaterialBrass,Copper,Stainless steel
Package Wayaccroding to customer's requirement
Delivery Time30 days as usual, it will base on the order QTY and delivery due to customer's plan
MOQ:1000PCS
Transportationshipping or airlift
EquipmentCNC machine
Customizedavailable
QC Inspection100% inspection before package and delivery
SampleSamples and Dimensions report will offer to customer for confirmation

Copper Tube Connector CNC Turning Parts Brass Lug JointQ&A
Q1:How can I get quotation from your company?

A:In order to quote you as soon as possible, please provide us the following information .
1). Detailed drawings (CAD/PDF/DWG/IGS/STEP/JPG)
2). Materials required
3). Surface treatment
4). Quantity (per order/per month/annual)
5). Any special demands or requirements, such as packing, labels,delivery,etc.

Q2:How long is the leading time from development to mass-production?

A:Normally the 1st article can be provided after confirm the design and cost. 30-60 days for first mass-production.
Q3:Can I get samples for testing?
A:We can offer free samples for small parts, but for big and high-value products, samples will be charged.
Q4: Can you provide after-sales services?
 A:Of course we can Generally it is 7-15 days after you receive the goods.
Q5: How long is the leading time from development to mass-production?
A: Normally the 1st article can be provided after confirm the design and cost. 30-60 days for first mass-production.