Fastener & Fitting

Yellow Zinc Plated Cross Pan Head Self Tapping Screw

Jiaxing Goshen Hardware Co., Ltd.
  • Type:Pan Head
  • Connection:Common Bolt

Base Info

  • Model NO.:DIN 7981
  • Head Style:Round
  • Standard:DIN
  • Grade:4.8
  • Application:Machinery, Building
  • Finish:Color-Zinc Plated
  • Name:Yellow Zinc Plated Cross Pan Head Self Tapping SCR
  • Size:3.5-6.3
  • Surface:Yellow Zinc Plated
  • Delivery Time:3-20days
  • Main Material:Carbon Steel
  • Payment:T,T,L,C,Western Union,Paypal
  • Packing:Bulking
  • Port:Shangahi or Ningbo
  • Certificate:ISO 9001:2015
  • Brand Name:Goshen
  • Transport Package:Carton + Pallet
  • Specification:3.5-6.3
  • Trademark:GS
  • Origin:China
  • HS Code:7318151001
  • Production Capacity:20ton,Week

Description

Materials Available1. Stainless Steel: SS201, SS303, SS304, SS316, SS416, SS4202. Steel:C45(K1045), C46(K1046),C203. Brass:C36000 ( C26800), C37700 ( HPb59), C38500( HPb58), C27200(CuZn37), C28000(CuZn40)4. Bronze: C51000, C52100, C54400, etc5. Iron: 1213, 12L14,12156. Aluminum: Al6061, Al60637.OEM according to your requestProducts Availablebolts, screws, nuts, rivets, stem nuts, shafts(axles, spline shafts, dart shafts),gears (pinions, wheels ) bearing, bearing seat, spring, connector, socket, bushing, push-button, etc.Surface Finishannealing, natural anodization, heat treatment,  polishing, nickel plating, chrome plating, yellow passivation, gold passivation, galvanizing, satin, etc.Processing Methodcnc machining, turning, milling, drilling, grinding, broaching, welding and assemblyQC (inspection everywhere ):Technicians self-check in productionSizecustomizedTolerance±0.01mmoffset distance±0.02mmPackageAs per customized specificationsCertificateISO9001:2008Description High-quality, rich manufacturing experienceLead Time3-20days
  Customer Question:
1.   What is MOQ?
      MOQ is 1000 pieces.

2.  Do you provide samples?
   Yes! Free samples.

3.  Where is the port of shipment?
     Shanghai.

4.  What is your payment term?
   30% T/T in advance, 70% before shippment or L/C !

5. How long is your delivery time?
   Mostly depending on your QTY. Generally 3-20 work days after payment received!