Fastener & Fitting

Wafer Head Self Tapping Screw Csk Phillip Head Screw

Guangdong Boito Building Technology Co., Ltd.
  • Material:Stainless Steel
  • Shape of Head:Wafer Head
  • Surface Finishing:Zinc Plated
  • Certification:ISO, RoHS
  • Customized:Customized
  • Name:Self Tapping Screw

Base Info

  • Model NO.:BT008
  • Transport Package:Plastic Bags+Cartons
  • Specification:4.8*25
  • Origin:China
  • Production Capacity:700 Tons,Year

Description

Wafer Head Self Tapping Screw CSK Phillip Head ScrewMaterialC1022, SUS304, SUS316, SUS410DiameterM3.5/M3.9/M4.2/M4.8/M5.5 /M6.3 or unstandard sizeLength15mm-150mmFinishZinc plated, class, ruspertDrill type#1, #2, #3, #4, #5, #6Head typeHex head, flat head, pan head, wafer head, truss head, flat round headWasherEPDM bonded washer (OD 16mm/19mm with thickness 0.5mm+2.5mm or 1mm+3mm)PackagePlastic bags and cartons or packing as your requestPayment term30%TT in advance and 70% TT before shipmentMOQ50000PCSWafer Head Self Tapping Screw Csk Phillip Head Screw
Wafer Head Self Tapping Screw Csk Phillip Head Screw
WORKSHOP

Wafer Head Self Tapping Screw Csk Phillip Head Screw
                                                                     WIRE
Wafer Head Self Tapping Screw Csk Phillip Head Screw                                                        PRODUCTION LINE
Wafer Head Self Tapping Screw Csk Phillip Head Screw                                                             STOCKING

QUALITY CONTROL

Wafer Head Self Tapping Screw Csk Phillip Head Screw
PACKAGE & TRANSPORTATION
Wafer Head Self Tapping Screw Csk Phillip Head Screw
PLASTIC BAGS/BOXES+CARTONS(customised package available)
FAQ
1. Are you trading company or manufacturer ?
We are factory located in Guangdong province.

2. How long is your delivery time?
Genarally 5-10 days if in stock. while 25-35 days if out of stock.

3. Do you provide samples?
Yes, samples provided are free of charge for your inspection.

4. How should I order and make payment?
For mass production, 30% paid for deposit by
T/T before production arrangement, the balance to be paid before shipment.