Fastener & Fitting

4.8/ 8.8/ 10.9/ 12.9 Grade China Washer Manufacturer DIN9021 DIN125A High Pressure Washer Spring Washer

Jiashan Dourdy Imp. & Exp. Trading Co., Ltd.
  • Standard:ANSI, DIN, GB
  • Type:Washer
  • Material:Carbon Steel
  • Structure:Washer
  • Connection:Washer
  • Sealing Surface:FM

Base Info

  • Model NO.:M2.5-M36
  • Manufacturing Way:Forging
  • Z/P:Z,P
  • Flat:Flat
  • Plain:Plain
  • Pressure:Pressure
  • Retaining:Retaining
  • Spring:Spring
  • Transport Package:Support Express -Sea Freight- Land Freight
  • Specification:M6, M8, M10, M12, M16, M18, M20
  • Origin:China
  • Production Capacity:100ton,Month

Description

Overview Product DescriptionDetailed Photos

4.8/ 8.8/ 10.9/ 12.9 Grade China Washer Manufacturer DIN9021 DIN125A High Pressure Washer Spring Washer4.8/ 8.8/ 10.9/ 12.9 Grade China Washer Manufacturer DIN9021 DIN125A High Pressure Washer Spring Washer4.8/ 8.8/ 10.9/ 12.9 Grade China Washer Manufacturer DIN9021 DIN125A High Pressure Washer Spring Washer4.8/ 8.8/ 10.9/ 12.9 Grade China Washer Manufacturer DIN9021 DIN125A High Pressure Washer Spring Washer4.8/ 8.8/ 10.9/ 12.9 Grade China Washer Manufacturer DIN9021 DIN125A High Pressure Washer Spring Washer4.8/ 8.8/ 10.9/ 12.9 Grade China Washer Manufacturer DIN9021 DIN125A High Pressure Washer Spring Washer4.8/ 8.8/ 10.9/ 12.9 Grade China Washer Manufacturer DIN9021 DIN125A High Pressure Washer Spring Washer

Packaging & Shipping

4.8/ 8.8/ 10.9/ 12.9 Grade China Washer Manufacturer DIN9021 DIN125A High Pressure Washer Spring Washer

FAQ

1:The quality of your products?

Answer:The company has advanced production and testing equipment .Every products will be 100%
inspected by our qc department before shipment
 2:How about your price? Answer:High quality products with reasonable price.Please give me a inquire, I will quoted you a price for you refer at once.  3:Could you provide free samples? :Answer: We can provide free samples for standard fastener, But the clients will pay the Express charges.  4: What's your Delivery Time?
Answer:Standard parts: 7-15days,Non-standard parts: 15-25days.We will make the delivery as soon as possible with the guarantee quality.